March, 2019

now browsing by month

 

Tyax Kitchen Positions

Tyax Lodge & Heliskiing

Tyax Lodge & Heliskiing invites you to join our culinary team for the summer 2019 season. Employment with Tyax will provide you the opportunity to develop new culinary skills while saving money and enjoying the ultimate summer experience. Cooks will work in a remote setting and create a unique experience for our guest. This is a unique opportunity that will allow you to diversify your culinary techniques and execute high-quality production.
Employees are encouraged to enjoy the wilderness, adventure in the mountains, or relax in our luxurious spa. This summer, escape the city and enjoy breathtaking views of the Chilcotin Mountains.

Click on the following links for more information about each position.

Chef de Partie

Pastry Chef

Sous Chef

Junior Sous Chef

Lead Breakfast Chef

Dishwasher Prep Cook

Tyax Housekeeping Attendant

tyaxhousekeeping

Church Foundation Wall EOI

church

Objective / Purpose
The objective of this Expression of Interest (EOI) is to expose the exterior foundation walls and drainage system in 3 identified areas, where they are cracked and water is seeping into the basement.
Key Dates
This objective is to be completed by May 10, 2019 and dependent on favorable ground conditions. On completion of the foundation and drainage system remedial work backfill the excavations, rake and clean up the area where work was performed.

BackgroundHistory
The church foundation has had some modifications in the past as it was raised   at one point to make a basement, the east side foundation wall tilted in and it was pulled back and another concrete wall was placed beside it to help the issue, and the whole drainage system was replaced and cracks filled in and weatherproofing was put on all the foundation walls. Currently there is water seeping into the basement with three known areas that require attention. (pictures are available upon request)

Service / Work Requirements

Expectations
- Due to the heritage nature of the Bralorne Church and grounds. This is a task that has to be done with great care!
- The three areas locations, depths and lengths are:
under the front entrance porch – 4’ deep x 12’ long
south wall at the bathroom area – 6’ deep x 8’ long
east inside corner walls – 6’ deep x 10’ long
- Excavate the 3 areas to just above the drainage system by machine. Expose the drainage system by hand for further inspection. Clean the foundation walls for inspection.
- Excavations to be done to WorkSafeBC standards.
- The removed dirt to be placed on tarps.
- Once exposed, analysis and work plan will be drawn up by the BRVCA Heritage Committee.
- Once the foundation walls and or drainage system remedial work is completed the task of the backfilling, raking and cleanup of the area can be completed.

Requirements

A small machine would be preferred to perform this work along with hand digging.
Subcontracting will be allowed if required.
It would be preferred if the proponent had some foundation wall and drainage repair experience.
Pricing
It is preferred that in-kind work or discount be provided as this is a community venture.
This Expression of Interest Contract will be a fixed price for time, materials, equipment and any out of pocket expenses.

Submission Guidelines
Proponent Organization / Profile / Technical Skills / Experience
Proponent shall identify relevant management, administrative, and financial capabilities as well as technical and necessary skills, qualifications, experience, and equipment that they consider appropriate to the evaluation of their ability to successfully undertake the proposed work and meet the Expression of Interest objectives.
WorkSafeBC Number will be required unless the proponent optionally and at the discretion of the BRVCA make the proponent an employee so that the proponent will work under the BRVCA’s WorkSafeBC Policy.
General Commercial Liability Insurance Policy must be submitted unless the proponent optionally and at the discretion of the BRVCA make the proponent an employee so that the proponent will work under the BRVCA’s General Commercial Liability Insurance Policy.
Proponents to submit their fixed price in their submission.

Submission of Proposal
Proponent shall submit a signed copy of the proposal either by mail, dropped off at the Gold Bridge Community Resource Building or via e-mail.
All proposals must be submitted to the BRVCA by April 12, 2019.
Mailing Address:
Gold Bridge Community Resource Building
104 Haylmore St.
Gold Bridge B.C.
V0K 1P0

Bridge River Valley Community Association’s e-mail address:
bridgerivervalley@gmail.com

Maintenance Support Worker

Maintenance Support

The Bridge River Valley Community Assoc. is seeking a contractor as a Maintenance Support Worker.

The contract will provide a yearly retainer of $2000 and would be for a minimum of 50 hours and up to 70 hours for the year as per the conditions set up below.  This is for an initial one year term from April 1 2019 to March 31, 2020 and may be extended a further year.

Please respond to worktodo@bridgerivervalley.ca with your expression of interest by March 31. Call Jenny at the office (250)238-2534 if you have questions and she will get the right person for you to speak to.

-Jobs that escalate beyond the retainer duties will be confirmed as such in writing and contractor will provide an estimate prior to completing the work

-Rate of pay will be $25 for non-tradesmen related tasks and $40 per hour for tradesmen related taks

-Sub Contracting will be permitting or seeking out another employees/contractor for BRVCA is encouraged

-Contractors providing services must maintain current Worksafe coverage and liability insurance.  In circumstances where a contractor does not carry Worksafe coverage or liability insurance, the BRVCA may, depending on the scope and type of service, choose to proceed with a contract under the BRVCA Worksafe BC and Liability Insurance

General

-Assist with developing bidding document for projects

-First Right of Refusal of projects within scope of contractor’s expertise

-On Call (within reason) when an extra set of hands are needed

-On Call (within reason) for small or emergent issues when assistance is required

Gold Bridge Refuse Containers

-May 15 to October 15 Empty refuse, take to transfer station (petty cash), recyleables to school

-Lock up and unlock refuse containers May 15 and October 15

Community Resource Building 

-Modify the schedule for the thermostat as needed to ensure we are not overpaying and don’t freeze and to ensure basement

Temperature stays above zero

Haylmore:

-May – put up canvas frame and tent

-May -  add water/re-water gold panning trough, add clean sand if needed

-Oct – take down canvas frame and tent, ensure stored safely and dryly at the CRB

-October – set up mouse and rat traps – monitor 3 times over the winter

Bralorne Pioneer Mines Office

-Be on call for emergency/urgent type calls (breaker blows for example)

-Basic maintenance for laundry machines, smoke alarms etc.

Church

-Ensure water is turned on a stand pile (April 15 ish)(except right now as we have a drainage issue)

-Ensure water is  turned off and blown out correctly

Cemetery

Replenish basic supplies – river rock, lava ash and keep an eye on landscape cloth

Kiosks

Damage patrol

Sand and Restain any areas of graffiti as needed

Once a year clean plexiglass (take off to do both sides), no specific schedule can be

Done as is convenient

Porta Potties

Move porta potties and return as needed (mileage extra)

Report back re cleanliness etc.